| Project DRUM INLET: Explosive Excavation in Saturated Sand. (1998) | |||||||||
Abstract | |||||||||
| The report documents the explosive excavation phase of Project Drum Inlet, the reopening of Drum Inlet navigation channel through the Outer Banks off the North Carolina coast. The design, implementation, and technical program results of the explosive event are described. A brief summary of the origin, history, and overall results of the project is also uncluded. | |||||||||
Details der Publikation | |||||||||
| |||||||||