Linac4 Technical Design Report (2006)
Arnaudon, L, Baudrenghien, P, Baylac, M, Bellodi, G, Body, Y, Borburgh, J, ...
Linac4 is an H- linear accelerator, intended to replace Linac2 as injector to the PS Booster (PSB). By delivering to the PSB a beam at 160 MeV energy, Linac4 will provide the conditions to double the...
The SPL (II) at CERN, a Superconducting 3.5 GeV H- Linac (2006)
Gerigk, F, Baylac, M, Bellodi, G, Benedico-Mora, E, Body, Y, Caspers, F, ...
A revision of the physics needs and recent progress in the technology of superconducting (SC) RF cavities have triggered major changes in the design of a SC H-linac at CERN. With up to 5MW beam...
Construction progress of the cooling & ventilation in the LHC project (2003)
Body, Y, Jena, H, Josa, F, Monsted, A, Pirollet, B
After the LEP dismantling Phase the Cooling and Ventilation Group has started the LHC construction work. Year 2001 through to 2004 will certainly be the most important period of activity for the CV...
The control system implementation for the cooling and ventilation facilities connected to the LHC Project relies on the technical and human resources that are organised within large-size industrial...